– Fairly priced.

Auction products.

Bid on Prisma for our current storage products.

Speicherzone Nord SY 26/27 (1) – 4.46 TWh

Speicherzone Nord SY 26/27 (1) – 4.46 TWh

Storage location

Speicherzone Nord (market area THE)

Allocation date

18/12/2025, 11:00–11:30 CET

Contract period

01/04/2026–01/04/2027

Allocation mode/Pricing

Pay-as-bid

Plattform

PRISMA

Capacity on offer

4.46 TWh

Structure firm***

Structure interr.****

64 / 85 [days]

view more

Contact for Marketing Enquiries

Tel.: +49 561 99858-7174
Tel.: +49 561 99858-7178
E-mail: sales@sefe-storage.de

Bundle structure

Volume firmVolume interr.Injection firmInjection interr.Withdrawal firmWithdrawal interr.
44,676,308 kWh21,559 kWh/h7,500 kWh/h33,159 kWh/h

Price model

Storage feeFixed price
Variable injection fee0 €/MWh
Variable withdrawal fee0 €/MWh
Service fee0 €

Conditions

Renomination lead time connection point2 h

Connection Point

Market AreaTSONameOffered Capacity Products
THEGASCADE37Z0000000089417uFZK

Injection Curve

Flat injection curve applies.

Withdrawal Curve

Working Gas Volume between 55.5% and 20%:
WR [%] = WGV [%] x 1.436 + 20.302

Working gas level between 20% and 19.9%:
WR [%] = WGV [%] x 76.436 – 1479.03

Working gas level between 19.9% and 13.1%:
WR [%] = WGV [%] x 1.403882353 + 14.10914118

Working gas level lower than or equal to 13.1%:
WR [%] = WGV [%] x 0 + 32.5

Miscallaneous / Comments

Allocation of capacity a few minutes after closing.

No curves apply to interruptible capacity.

This storage product is subject to the maintenance plan of UGS Rehden.

Regulatory filing requirements:
1. November 2026 = 45% / 1. February 2027 = 30%.

open PRISMA Capacity Platform

Additional capacities and services

Additional capacities

There is more for you. Short-term capacities from within-day to all year round. 

view more

Remit

Time is money. We take over your storage status report to the authorities.  

view more

*** min. time to fully inject/withdraw using firm rates with consideration of storage curves
**** min. time to fully inject/withdraw using firm and interruptible rates with consideration of storage curves