REMIT Haidach natural gas storage facility
Information about planned and unplanned unavailability at the Haidach natural gas storage facility is published here.
NOTE:
The maximum withdrawal rate of SEFE Storage at the storage connection point Austria (“SAP AT”) is 3,666,667 kWh/h, which is lower than the maximum withdrawal rate of the Haidach storage facility (SEFE Storage).
Unless explicitly stated differently in the remark on the restriction, the published absolute and percentage restrictions always refer to the technically maximum possible injection and withdrawal rate of the Haidach storage facility (SEFE Storage), which is published here.