– Fairly priced.

Auction products.

Bid on Prisma for our current storage products.

Short-term product Rehden SY 26/27 (11) – 0.1 TWh

Short-term product
Rehden SY 26/27 (11) – 0.1 TWh

Storage location

Rehden (market area THE)

Allocation date

10/06/2026, 11:00–11:30 CET

Contract period

15/06/2026–16/07/2026

Allocation mode/Pricing

Pay-as-bid

Plattform

PRISMA

Capacity on offer

0.1 TWh

Structure firm***

15 / 15 [days]

Structure interr.****

15 / 15 [days]

view more

Contact for Marketing Enquiries

Tel.: +49 561 99858-7174
Tel.: +49 561 99858-7178
E-mail: sales@sefe-storage.de

Bundle structure

WGV firmVolume interr.Injection firmInjection interr.Withdrawal firmWithdrawal interr.
10,000,000 kWh028,000 kWh/h028,000 kWh/h0

Price model

Storage feeFixed price
Variable injection fee0 €/MWh
Variable withdrawal fee0 €/MWh
Service fee0 €

Conditions

Renomination lead time delivery point2 h

Delivery Point

Market AreaTSONameOffered Capacity Products
THEGASCADESpeicher RehdenbFZKtemp., DZK, UBK
THE starting 01/07/2026GASCADESpeicherzone Nord (Rehden)bFZKtemp., DZK, UBK

Injection Curve

Flat injection curve applies.

Withdrawal Curve

Flat withdrawal curve applies.

Miscallaneous / Comments

Allocation of capacity a few minutes after closing.
No respective current filling level requirements have to be considered.
No option to book additional FCFS capacity.

open PRISMA Capacity Platform

*** min. time to fully inject/withdraw using firm rates with consideration of storage curves
**** min. time to fully inject/withdraw using firm and interruptible rates with consideration of storage curves