– Fairly priced.

Auction products.

Bid on Prisma for our current storage products.

Rehden SY 26/27 II (26) – Options Product – 6.3 TWh

Rehden SY 26/27 II (26) – Options Product – 6.3 TWh

Storage location

Rehden (market area THE)

Allocation date

27/08/2026, 11:00–11:30 CET

Contract period

01/09/2026–01/06/2026

Allocation mode/Pricing

Pay-as-bid

Plattform

PRISMA

Capacity on offer

6.3 TWh

Structure firm***

64 / 144 [days]

Structure interr.****

64 / 144 [days]

view more

Contact for Marketing Enquiries

Tel.: +49 561 99858-7174
Tel.: +49 561 99858-7178
E-mail: sales@sefe-storage.de

Bundle structure

TermWGV firmVolume interr.Injection firmInjection interr.Withdrawal firmWithdrawal interr.
01/09/2026–01/04/2027111,690,770 kWh072,850 kWh/h056,510 kWh/h0
01/04/2027–01/06/2027011,169,077 kWh0009,900 kWh/h

Price model

Storage feeFixed price
Variable injection fee1.30 €/MWh
Variable withdrawal fee0 €/MWh
Service fee0 €

Conditions

Renomination lead time delivery point2 h

Delivery Point

Market AreaTSONameOffered Capacity Products
THEGASCADESpeicherzone Nord (Rehden)bFZKtemp, DZK (Entry), uFZK

Injection Curve

Flat injection curve applies.

Withdrawal Curve

Working gas level between 55.5 % and 20 %:
WR [%] = WGV [%] x 1.436 + 20.302

Working gas level lower than or equal to 20 %:
WR [%] = WGV [%] x 1.436 + 13.47

Miscallaneous / Comments

Allocation of capacity a few minutes after closing.
The respective current filling level requirements have not to be considered.
No curves apply to interruptible capacity.
It is not possible to make additional bookings for injection and withdrawal capacity on a first-come, first-served basis.

open PRISMA Capacity Platform

*** min. time to fully inject/withdraw using firm rates with consideration of storage curves
**** min. time to fully inject/withdraw using firm and interruptible rates with consideration of storage curves