– Fairly priced.

Auction products.

Bid on Prisma for our current storage products.

Jemgum SY 25/26 (3) – 2.3 TWh

Jemgum SY 25/26 (3) – 2.3 TWh

Storage

Jemgum (market area THE/GTS)

Allocation date

16/05/2025, 11:00–11:30 CET

Contract period

17/05/2025 – 01/04/2026

Allocation mode/Pricing

Pay-as-bid

Plattform

PRISMA

Capacity on offer

2.3 TWh

Structure (firm)***

63 / 42 days

Structure (firm+ interr.)****

63 / 42 days

view more

Contact for Marketing Enquiries

Tel.: +49 561 99858-7174
Tel.: +49 561 99858-7178
E-mail: sales@sefe-storage.de

Bundle structure

Volume firmVolume interr.Injection firmInjection interr.Withdrawal firmWithdrawal interr.
76,870,430 kWh50,740 kWh/h76,870 kWh/h

Price model

Storage feeFixed price
Variable injection fee0 €/MWh
Variable withdrawal fee0 €/MWh
Service fee0 €

Conditions

Renomination lead time connection point Jemgum2 h
Renomination lead time connection point Oude1/2 h

Connection Point

Market AreaTSONameOffered Capacity Products
THEGASCADE1BMAbFZKtemp (exit), UBK
TTFGTS301391FZK, UBK

Injection Curve

Flat injection curve applies.

Withdrawal Curve

Flat withdrawal curve applies.

Miscallaneous / Comments

Allocation of capacity a few minutes after closing

The respective current filling level requirements have to be considered:
1 November 2025 = 80% / 1 February 2026 = 30%

open PRISMA Capacity Platform

Additional capacities and services

Additional capacities

There is more for you. Short-term capacities from within-day to all year round. 

view more

Remit

Time is money. We take over your storage status report to the authorities.  

view more

*** min. time to fully inject/withdraw using firm rates with consideration of storage curves
**** min. time to fully inject/withdraw using firm and interruptible rates with consideration of storage curves