Haidach SY 26/27/28 (1) – 2.6 TWh
Storage location | Haidach (market area THE + CEGH) |
Allocation date | 20/11/2025, 11:00–11:30 CET |
Contract period | 01/04/2026–01/04/2028 |
Allocation mode/Pricing | Pay-as-bid |
Plattform | PRISMA |
Capacity on offer | 2.6 TWh |
Structure firm*** | 94 / 128 [days] |
Structure interr.**** | 94 / 100 [days] |
Contact for Marketing Enquiries
Tel.: +49 561 99858-7174
Tel.: +49 561 99858-7178
E-mail: sales@sefe-storage.de
Bundle structure
| Term | Volume firm | Volume interr. | Injection firm | Injection interr. | Withdrawal firm | Withdrawal interr. |
|---|---|---|---|---|---|---|
| 01/04/2026–01/04/2027 | 29,137,652 kWh | – | 15,134 kWh/h | – | 10,324 kWh/h | 3,016 kWh/h |
| 01/04/2027–01/04/2028 | 29,137,652 kWh | – | 15,134 kWh/h | – | 10,324 kWh/h | 3,016 kWh/h |
Connection Point
| Market Area | TSO | Name | Offered Capacity Products |
|---|---|---|---|
| THE | bayernets GmbH | BAY-700069-8021-1/ BAY-700069-8021-2 | FZK, bFZKtemp, DZK, UBK |
| THE | Open Grid Europe GmbH | 3433P/3433I | bFZKtemp, UBK |
| CEGH | Netz Oberösterreich GmbH | SAP AT | See storage specification §2 |
Miscallaneous / Comments
Allocation of capacity a few minutes after closing.
The respective current filling level requirements have to be considered.
The use of the capacity restricted by curves is not free of charge and is billed according to the regulation in the storage specification.
The SAP AT can be used in accordance with the CROSS-BORDER rules.
Transport capacities at the Austrian storage connection point (“SAP AT”) into the Austrian pipeline network (Netzebene 1) can be purchased from SEFE Storage.