– Fairly priced.

Auction products.

Bid on Prisma for our current storage products.

Rehden II Options Product SY 26/27 (23) – 5 TWh

Options Product
Rehden II SY 26/27 (23) – 5 TWh

Storage location

Rehden (market area THE)

Allocation date

13/08/2026, 11:00–11:30 CET

Contract period

01/09/2026–01/06/2027

Allocation mode/Pricing

Pay-as-bid

Plattform

PRISMA

Capacity on offer

5 TWh

Structure firm***

64 / 144 [days]

Structure interr.****

64 / 144 [days]

view more

Contact for Marketing Enquiries

Tel.: +49 561 99858-7174
Tel.: +49 561 99858-7178
E-mail: sales@sefe-storage.de

Bundle structure

TermWGV firmVolume interr.Injection firmInjection interr.Withdrawal firmWithdrawal interr.
01.09.2026 - 01.04.2027111.690.770 kWh072.850 kWh/h056.510 kWh/h0
01.04.2027 - 01.06.2027011.169.077 kWh/h0009.900 kWh/h

Price model

Storage feeFixed price
Variable injection fee1 €/MWh
Variable withdrawal fee0 €/MWh
Service fee0 €

Conditions

Renomination lead time delivery point2 h

Delivery Point

Market AreaTSONameOffered Capacity Products
THEGASCADESpeicherzone Nord (Rehden)bFZKtemp (exit), UBK

Injection Curve

Flat INJECTION CURVE applies.

Withdrawal Curve

Working Gas Volume between 55.5% and 20 %:
WR [%] = WGV [%] x 1.436 + 20.302

Working Gas Volume lower than or equal to 20 %:
WR [%] = WGV [%] x 1.436 + 13.47 

Miscallaneous / Comments

Allocation of capacity a few minutes after closing.
No respective current filling level requirements have to be considered.
No option to book additional FCFS capacity.

open PRISMA Capacity Platform

*** min. time to fully inject/withdraw using firm rates with consideration of storage curves
**** min. time to fully inject/withdraw using firm and interruptible rates with consideration of storage curves