– Fairly priced.

Auction products.

Bid on Prisma for our current storage products.

Rehden SY 26/27 (2) – 3 TWh

Rehden SY 26/27 (2) – 3 TWh

Storage location

Rehden (market area THE)

Allocation date

06/11/2025, 11:00–11:30 CET

Contract period

01/04/2026–01/06/2027

Allocation mode/Pricing

Pay-as-bid

Plattform

PRISMA

Capacity on offer

3 TWh

Structure firm***

161 / 144 [days]

Structure interr.****

81 / 144 [days]

view more

Contact for Marketing Enquiries

Tel.: +49 561 99858-7174
Tel.: +49 561 99858-7178
E-mail: sales@sefe-storage.de

Bundle structure

 Volume firmVolume interr.Injection firmInjection interr.Withdrawal firmWithdrawal interr.
01/04/26–01/04/27111,690,770 kWh036,731 kWh/h36,731 kWh/h56,510 kWh/h0
01/04/27–01/06/27011,169,077 kWh0009,900 kWh/h

Price model

Storage feeFixed price
Variable injection fee0 €/MWh
Variable withdrawal fee0 €/MWh
Service fee0 €

Conditions

Renomination lead time delivery point2 h

Delivery Point

Market AreaTSONameOffered Capacity Products
THEGASCADESpeicher RehdenbFZKtemp., DZK, UBK

Injection Curve

Working gas level between 55.5 % and 100 %:
IR [%] = WGV [%] x (–1.436) + 179.698

Withdrawal Curve

Working gas level between 55.5 % and 20 %:
WR [%] = WGV [%] x 1.436 + 20.302

Working gas level lower than or equal to 20 %:
WR [%] = WGV [%] x 1.436 + 13.47

Miscallaneous / Comments

Allocation of capacity a few minutes after closing
The respective current filling level requirements have to be considered
No curves apply to interruptible capacity
Regulatory filing requirements: 
1. November 2026 = 45 % / 1. February 2027 = 30 %

open PRISMA Capacity Platform

*** min. time to fully inject/withdraw using firm rates with consideration of storage curves
**** min. time to fully inject/withdraw using firm and interruptible rates with consideration of storage curves