– Fairly priced.

Auction products.

Bid on Prisma for our current storage products.

Rehden SY 25/26 II (10) – 3 TWh

Rehden SY 25/26 II (10) – 3 TWh

Storage location

Rehden (market area THE)

Allocation date

09/08/2025, 11:00-11:30 CET

Contract period

09/08/2025 – 01/06/2026

Allocation mode/Pricing

Pay-as-bid

Plattform

PRISMA

Capacity on offer

3 TWh

Structure firm***

81 / 144 [days]

Structure interr.****

81 / 144 [days]

view more

Contact for Marketing Enquiries

Tel.: +49 561 99858-7174
Tel.: +49 561 99858-7178
E-mail: sales@sefe-storage.de

Bundle structure

 Volume firmVolume interr.Injection firmInjection interr.Withdrawal firmWithdrawal interr.
09/08/25–01/04/26111,690,770 kWh072,850 kWh/h056,510 kWh/h0
01/04/26–01/06/26011,169,077 kWh0009,900 kWh/h

Price model

Storage feeFixed price
Variable injection fee0 €/MWh
Variable withdrawal fee0 €/MWh
Service fee0 €

Conditions

Renomination lead time delivery point2 h

Delivery Point

Market AreaTSONameOffered Capacity Products
THEGASCADESpeicher RehdenbFZKtemp., DZK, UBK

Injection Curve

Working Gas Volume of the Storage Customer in %
Flat INJECTION CURVE applies.

Withdrawal Curve

Working gas level between 55.0348189415042 % and 20 %:
WC [%] = WGV [%] x 1.436 + 20.97

Working gas level lower than or equal to 20 %:
WC [%] = WGV [%] x 1.436 + 13.47

Miscallaneous / Comments

Allocation of capacity a few minutes after closing

The respective current filling level requirements have to be considered

No curves apply to interruptible capacity

Regulatory filing requirements:
1 November 2025 = 45% / 1 February 2026 = 30%

open PRISMA Capacity Platform

*** min. time to fully inject/withdraw using firm rates with consideration of storage curves
**** min. time to fully inject/withdraw using firm and interruptible rates with consideration of storage curves